Home / Industries / Electrical work / Job sheets
Photos of cables before the plaster covers them
Electrical work: who, where, what, with photos.
How it is now
A year later the customer asks if they can drill above the basin. The photos are somewhere on your phone among a hundred others.
How it will be
Each site has a folder by room, where you photograph cable runs and boxes as you go and note materials used. At the end you can send the customer a room-by-room overview. When there is a fault, you see at once what you did and when.
The first message you write
For every house I want to save photos of the cables room by room before plastering. Build me simple entry from the phone, searchable later by address, with a list of materials used.
In your own words, typos and all. Whatever AI does not know, it asks.
Try how it would work
A working demo with made-up data. Nothing is sent.
How it goes
You open the site on your phone
Choose the room and photograph the wall
Add the materials used
Send the customer an overview at the end
What you need to have
- List of your sites
- The habit of photographing every wall with a measure beside it
- A decision on what the customer gets and what stays with you
Watch out for
Photos do not replace test results or as-built drawings. The customer should still check before drilling.
Medium: a few evenings and a review
More for: Electrical work
- A call during work is not forgottenInstead of a missed call, a short form: what is not working, where, how urgent, with a photo of the fuse box.
- From a room-by-room count to a quoteYou enter sockets, switches, lights and fuse boxes by room, and the quote is built from your prices.
- When it is time to test againA list of sites with the date of the last test and a reminder before your agreed deadline.
- I know what is in the vanA short list of standard van stock and a shopping list that builds up as you go.
- Done but not yet billedA view of jobs waiting for an invoice and invoices still not paid.
Would you build this for yourself?
Start for €49. When you want it live, add €150. Prices include VAT. Sales are not open yet.