Dates tied to drying and other trades
Tiling and flooring: the customer picks a free slot, you confirm.
How it is now
You arrive and the screed is still damp or the tiles are missing. The day is lost and the next client waits.
How it will be
Each job has start conditions you tick off: screed dry, pipes and wiring done, material delivered. A week before, the client gets a questionnaire. If a condition is missing, you see whom you can move forward.
The first message you write
I often arrive at a site that is not ready. Make me a job list with conditions that must be met, and a week before send the client questions after I approve them.
In your own words, typos and all. Whatever AI does not know, it asks.
Try how it would work
A working demo with made-up data. Nothing is sent.
How it goes
Gets a list of what must be ready
Answers a week before
Confirms material delivery
Gets a new date if delayed
What you need to have
- Conditions by floor type
- Agreed jobs with estimated days
- Short backup jobs
Watch out for
The maker and your measurement decide drying time and allowed moisture, not the calendar.
Medium: a few evenings and a review
More for: Tiling and flooring
- A quote with the subfloor listed separatelyLaying, levelling, waterproofing, cuts and removal of the old floor as separate items.
- How many tiles the client should orderThe client enters the room and tile size and gets quantity with waste, a pattern preview and a rough labour price.
- Tile layout approved before the adhesiveFor each room a sketch, start point, grout, trims and photos the client approves in advance.
- A recommendation with a photo of the finished roomAfter handover you ask for a review and permission to publish photos.
- Leftover batches that still come in handyA list of spare tiles and adhesive by job, so you know what you have and whose it is.
Would you build this for yourself?
Start for €49. When you want it live, add €150. Prices include VAT. Sales are not open yet.